Theme · 02 · Energy infrastructure

Civil Nuclear.

The first sustained nuclear buildout in fifty years runs through a six-layer supply chain: from uranium pulled out of the ground, through enrichment and fuel fabrication, into the reactors themselves, old fleet, new fleet, and the small-modular generation moving through regulatory review. Below: the public US-listed companies operating in each layer.

6 layers
25 companies
US-listed only
Updated live
The map

Six layers, one supply chain.

Source at the apex. Grid at the foundation. Every US-listed public company actually operating in between.

LAYER 06 · FOUNDATION Grid Hardware & Storage GEV · NEE · FLNC · EOSE LAYER 05 Nuclear Utilities CEG · VST · EXC · D · DUK · PEG · ETR · SO LAYER 04 Reactor Engineering & EPC FLR · PWR LAYER 03 Small Modular Reactors SMR · NNE · OKLO LAYER 02 Fuel Cycle Services LEU · BWXT APEX Uranium Mining LAYER 01 · APEX CCJ · UEC · DNN · NXE · UUUU · URG ↑ ENABLES ↑ 25 COMPANIES · US-LISTED
Layer 01 · Source

Uranium Mining

The miners pulling yellowcake U3O8 out of Saskatchewan, Wyoming, and Niger. Spot uranium has tripled since 2020 on supply discipline and reactor restart commitments, these are the producers and developers selling into that market.

Layer 02 · Conversion

Fuel Cycle Services

Conversion of U3O8 into UF6, enrichment to reactor grade, and the high-assay low-enriched uranium (HALEU) needed for next-generation reactors. The bottleneck the whole industry is trying to clear.

Layer 03 · Next-gen

Small Modular Reactors

Public companies developing reactor designs in the 1–300 MW range. Several have NRC pre-application activity or DOE demonstration funding; first commercial operations are targeted for the late 2020s and early 2030s.

Layer 04 · Construction

Reactor Engineering & EPC

Engineering, procurement, and construction contractors with nuclear-grade qualifications, the firms actually capable of bidding on AP1000, EPR, and SMR site work in the United States and allied countries.

Layer 05 · Operators

Nuclear Utilities

The regulated and merchant utilities operating the existing US reactor fleet, plus the ones with announced plans to restart retired units or co-locate SMRs with hyperscaler data centers. Long-duration contracted cash flow.

Layer 06 · Grid

Grid Hardware & Storage

The interconnect, transmission, and storage layer that any new nuclear capacity has to land into. Gas turbine OEMs, transmission EPC, and long-duration battery integrators, every megawatt of nuclear needs grid to absorb it.

Methodology & coverage.

Constituent lists are reviewed quarterly against revenue mix, segment disclosures, regulatory filings, and stated capex commitments. Quotes are sourced from licensed market data; the Veridion Score is computed from six published factors. Inclusion is not a recommendation.